Power and water in Aguascalientes, confirmed before you sign a lease.
Substation capacity and water rights verified across San Francisco de los Romo and the airport corridor, so your automotive and appliance manufacturing equipment gets what it needs on day one.
A fully guided search — on us.
We analyze the market, shortlist the strongest buildings and land for your operation, and arrange your industrial-park inspection tour — at no cost to your company.
Free market & site analysis
We benchmark power, water, labor, and logistics against your plant, at no charge.
Vetted, on-the-ground options
Only buildings and land our own team has verified make your shortlist.
Guided inspection tours
We plan the visit and walk every park with you, in person — on us.
| Typical power verified | States covered | On-site confirmed | Cost to you |
|---|---|---|---|
| 10-45 MW | 9 | 100% | 0 |
How Aguascalientes connects to the routes you actually use.
Approximate road distance from Aguascalientes to the crossings, ports, and hubs that matter for industrial utilities.
| Destination | Distance |
|---|---|
| Mexico City | ~480 km |
| Port of Manzanillo | ~450 km |
| Nuevo Laredo border crossing | ~700 km |
Why manufacturers pick us for industrial utilities in Aguascalientes.
What makes us the right partner in Aguascalientes.
We already audit Aguascalientes's grid
San Francisco de los Romo, the airport corridor, and the Zona Industrial are inside our regular utility-verification coverage.
Direct utility confirmation
We coordinate with CFE and local water authorities in Aguascalientes — not secondhand numbers.
No cost to you
Utility audits in Aguascalientes are part of our no-cost service.
What changes when you don't do this alone.
| Going it alone | With Industrial Softlanding | |
|---|---|---|
| Site power & water data | Landlord estimates, confirmed after you sign (if at all) | Confirmed directly with CFE and local water authorities before you sign |
| Permits | Filed, then you wait | Filed and tracked to approval, in parallel with construction |
| Local authority relationships | Built from scratch, per project | Already established — we're the liaison |
| Time to first article | Often 20+ months | Median 14 months |
| Cost | Broker fees, consultants, delay costs | No cost to your company |
From first call to first article.
Tell us your load
kW draw, water volume, gas pressure, and any redundancy requirements.
We verify with the utility
Direct confirmation with CFE and local water authorities — not secondhand numbers.
Receive the utility report
A clear breakdown of what is available, what is missing, and what it costs to close the gap.
Move forward with certainty
Use the report in site selection, lease negotiation, or your board presentation.
“We had been quoted eight megawatts available. Their audit found it was actually four and a half. Better to know before we signed.”
Frequently asked.
Do you work directly with CFE in Aguascalientes?
Yes, we coordinate directly with CFE and local Aguascalientes utilities.
Can you help if a Aguascalientes site falls short on power?
Yes — we can scope substation upgrades or on-site generation and estimate timeline and cost.
How long does a Aguascalientes utility verification take?
Typically five to seven business days per site.