Know the numbers in Aguascalientes before you commit a dollar.
Power, water, labor, and permitting timelines verified on the ground in San Francisco de los Romo and the airport corridor — not estimated from a spreadsheet in another city.
A fully guided search — on us.
We analyze the market, shortlist the strongest buildings and land for your operation, and arrange your industrial-park inspection tour — at no cost to your company.
Free market & site analysis
We benchmark power, water, labor, and logistics against your plant, at no charge.
Vetted, on-the-ground options
Only buildings and land our own team has verified make your shortlist.
Guided inspection tours
We plan the visit and walk every park with you, in person — on us.
| Avg. turnaround | States covered | On-site verified | Cost to you |
|---|---|---|---|
| 72 hrs | 9 | 100% | 0 |
How Aguascalientes connects to the routes you actually use.
Approximate road distance from Aguascalientes to the crossings, ports, and hubs that matter for feasibility studies.
| Destination | Distance |
|---|---|
| Mexico City | ~480 km |
| Port of Manzanillo | ~450 km |
| Nuevo Laredo border crossing | ~700 km |
Why manufacturers pick us for feasibility studies in Aguascalientes.
What makes us the right partner in Aguascalientes.
We know Aguascalientes on the ground
Our team has walked sites across San Francisco de los Romo, the airport corridor, and the Zona Industrial — this is not our first project here.
automotive and appliance manufacturing expertise
Aguascalientes runs on automotive and appliance manufacturing. We benchmark your feasibility study against operators already running here.
No cost to your company
Feasibility studies in Aguascalientes are part of our no-cost site search service.
What changes when you don't do this alone.
| Going it alone | With Industrial Softlanding | |
|---|---|---|
| Site power & water data | Landlord estimates, confirmed after you sign (if at all) | Confirmed directly with CFE and local water authorities before you sign |
| Permits | Filed, then you wait | Filed and tracked to approval, in parallel with construction |
| Local authority relationships | Built from scratch, per project | Already established — we're the liaison |
| Time to first article | Often 20+ months | Median 14 months |
| Cost | Broker fees, consultants, delay costs | No cost to your company |
From first call to first article.
Define the scope
Tell us your process, footprint, and target launch date.
We verify on the ground
Our team walks the site, confirms utility capacity, and audits the labor pool.
Receive the report
A single document covering power, water, labor, cost, and timeline — board ready.
Decide with confidence
Move to site selection and permitting with numbers instead of guesses.
“Their feasibility study caught a substation capacity gap our own engineers missed. That single finding saved us a year.”
Frequently asked.
How fast can I get a feasibility study in Aguascalientes?
Most Aguascalientes studies are delivered in five to ten business days, covering sites across San Francisco de los Romo and the airport corridor.
Do you know Aguascalientes's zones well?
San Francisco de los Romo, the airport corridor, and the Zona Industrial are all inside our regular coverage area, not a one-off assignment.
What does it cost?
Nothing. Feasibility studies in Aguascalientes are part of our no-cost site search service for manufacturers evaluating Aguascalientes.
