
Site Selection in Aguascalientes
Every site in Aguascalientes, scored against your production envelope.
Automotive and aerospace tenants need very different buildings. We benchmark sites against the plant you're actually building, not a generic industrial park listing.
Free. No cost to your company.
6 industrial parks vetted · dual-cluster access mapped
A fully guided search, on us.
We analyze the market, shortlist the strongest buildings and land for your operation, and arrange your industrial-park inspection tour at no cost to your company.
| Item | What we do | Cost to you |
|---|---|---|
| Market & site analysis | We benchmark power, water, labor, and logistics against your plant. | $0 |
| Vetted, on-the-ground options | Only buildings and land our own team has verified make your shortlist. | $0 |
| Guided inspection tours | We plan the visit and walk every park with you, in person. | $0 |
Why manufacturers pick us for site selection in Aguascalientes.
Building fit verified, not assumed
We confirm clear height, floor load, and power quality match your equipment, whether automotive or aerospace-grade.
OEM and aerospace logistics scored
Real transit time to Nissan's complex and the airport-adjacent aerospace cluster.
Labor depth for your process
We model availability across automotive and aerospace-qualified trades.
Incentives modeled over 5 years
State and municipal abatements you actually qualify for, run against your real capex.
What changes when you don't do this alone.
| Item | Going it alone | With Industrial Softlanding |
|---|---|---|
| Site power & water data | Landlord estimates, confirmed after you sign (if at all) | Confirmed directly with CFE and local water authorities before you sign |
| Permits | Filed, then you wait | Filed and tracked to approval, in parallel with construction |
| Local authority relationships | Built from scratch, per project | Already established: we are the liaison |
| Cost | Broker fees, consultants, delay costs | No cost to your company |
From first call to first article.
- Step 1
Score your requirements
Six-minute intake on production needs, power, size, and timeline.
- Step 2
Shortlist in days
3-5 sites matched to your envelope, with utility and labor data attached.
- Step 3
Walk the shortlist
We walk the sites with you, clear height, floor load, and expansion land included.
- Step 4
Move to permitting
Once you pick a site, we hand off straight into municipal permitting.
We needed aerospace-grade power quality, not just automotive floor space. Industrial Softlanding screened for that difference.
Client note · name withheld
Frequently asked.
How is this different from a broker?
Brokers sell inventory. We score it against your production needs, power, and labor requirements first.
How fast can I get a shortlist for Aguascalientes?
Most clients get a scored shortlist within two weeks.
Do you check building fit before I tour?
Always, we confirm clear height, floor load, and utilities match your equipment first.
Can you also handle permitting once I pick a site?
Yes, the handoff into municipal permitting is immediate.