INDUSTRIAL SOFTLANDING Book a free callFree call
Example plan · illustrative, not a real parkLots scored on power, water, labor, customs · drag to pan
PROPERTY LINE L-16.2 HA L-27.4 HA L-37.0 HA L-45.1 HA L-512.8 HA L-614.6 HA E · E · 115 kV FEED · E · E W · W · POTABLE MAIN · W N 0 to 150 m L-6 · BEST FIT Power 25 MW Water 2,000 m³ Labor deep Customs 140 km 533 m
Site Selection in Aguascalientes

Site Selection in Aguascalientes

Every site in Aguascalientes, scored against your production envelope.

Automotive and aerospace tenants need very different buildings. We benchmark sites against the plant you're actually building, not a generic industrial park listing.

6Parks vetted in Aguascalientes
15 minTo Nissan's Aguascalientes complex
6 minTo score your requirements
5-yrIncentive modeling included
Start Your Aguascalientes Site Selection — Free

Free. No cost to your company.

6 industrial parks vetted · dual-cluster access mapped

SheetISL-001
ServiceSite Selection
Reply1 business day
Rev2026-07
ISL-002Scope & cost

A fully guided search, on us.

We analyze the market, shortlist the strongest buildings and land for your operation, and arrange your industrial-park inspection tour at no cost to your company.

ItemWhat we doCost to you
Market & site analysisWe benchmark power, water, labor, and logistics against your plant.$0
Vetted, on-the-ground optionsOnly buildings and land our own team has verified make your shortlist.$0
Guided inspection toursWe plan the visit and walk every park with you, in person.$0
ISL-003Site notes

Why manufacturers pick us for site selection in Aguascalientes.

Building fit verified, not assumed

We confirm clear height, floor load, and power quality match your equipment, whether automotive or aerospace-grade.

OEM and aerospace logistics scored

Real transit time to Nissan's complex and the airport-adjacent aerospace cluster.

Labor depth for your process

We model availability across automotive and aerospace-qualified trades.

Incentives modeled over 5 years

State and municipal abatements you actually qualify for, run against your real capex.

ISL-004Comparison

What changes when you don't do this alone.

ItemGoing it aloneWith Industrial Softlanding
Site power & water dataLandlord estimates, confirmed after you sign (if at all)Confirmed directly with CFE and local water authorities before you sign
PermitsFiled, then you waitFiled and tracked to approval, in parallel with construction
Local authority relationshipsBuilt from scratch, per projectAlready established: we are the liaison
CostBroker fees, consultants, delay costsNo cost to your company
ISL-005Sequence

From first call to first article.

  1. Step 1

    Score your requirements

    Six-minute intake on production needs, power, size, and timeline.

  2. Step 2

    Shortlist in days

    3-5 sites matched to your envelope, with utility and labor data attached.

  3. Step 3

    Walk the shortlist

    We walk the sites with you, clear height, floor load, and expansion land included.

  4. Step 4

    Move to permitting

    Once you pick a site, we hand off straight into municipal permitting.

ISL-006Client note

We needed aerospace-grade power quality, not just automotive floor space. Industrial Softlanding screened for that difference.

Client note · name withheld

ISL-007Questions

Frequently asked.

How is this different from a broker?

Brokers sell inventory. We score it against your production needs, power, and labor requirements first.

How fast can I get a shortlist for Aguascalientes?

Most clients get a scored shortlist within two weeks.

Do you check building fit before I tour?

Always, we confirm clear height, floor load, and utilities match your equipment first.

Can you also handle permitting once I pick a site?

Yes, the handoff into municipal permitting is immediate.

ISL-008References
ISL-009Next action

Tell us what you build. We'll tell you where it lands in Aguascalientes.

Free. No cost to your company. A softlanding lead replies within one business day.

Free. No cost to your company.

Chat with Us