INDUSTRIAL SOFTLANDING Book a free callFree call
Example plan · illustrative, not a real parkLots scored on power, water, labor, customs · drag to pan
PROPERTY LINE L-16.2 HA L-27.4 HA L-37.0 HA L-45.1 HA L-512.8 HA L-614.6 HA E · E · 115 kV FEED · E · E W · W · POTABLE MAIN · W N 0 to 150 m L-6 · BEST FIT Power 25 MW Water 2,000 m³ Labor deep Customs 140 km 533 m
Softlanding in Reynosa

Softlanding Services in Reynosa

Land across the line from McAllen's supply chain.

Reynosa has run electronics and appliance maquiladoras for decades, minutes from McAllen, Texas. We handle site, permits, and local-authority liaison so distribution isn't an afterthought.

14+Plants landed in Reynosa
15 minTo the McAllen crossing
12 moAvg. to first article
2Decades-deep manufacturing sectors
Book Your Reynosa Industrial Tour — At No Cost

Free. No cost to your company.

14+ plants landed · electronics & appliance base

SheetISL-001
ServiceSoftlanding
Reply1 business day
Rev2026-07
ISL-002Scope & cost

A fully guided search, on us.

We analyze the market, shortlist the strongest buildings and land for your operation, and arrange your industrial-park inspection tour at no cost to your company.

ItemWhat we doCost to you
Market & site analysisWe benchmark power, water, labor, and logistics against your plant.$0
Vetted, on-the-ground optionsOnly buildings and land our own team has verified make your shortlist.$0
Guided inspection toursWe plan the visit and walk every park with you, in person.$0
ISL-003Site notes

Why manufacturers pick us for softlanding in Reynosa.

Electronics & appliance supplier base

Decades of maquiladora experience in electronics assembly and appliance manufacturing.

Same-day cross-border logistics

Minutes from the McAllen crossing puts your dock within a half-day of major US distribution.

Permits filed in parallel

Municipal and environmental filings run alongside construction, not after it.

Established labor market

Decades of maquiladora presence mean trained operators, not a market you build from zero.

ISL-004Comparison

What changes when you don't do this alone.

ItemGoing it aloneWith Industrial Softlanding
Site power & water dataLandlord estimates, confirmed after you sign (if at all)Confirmed directly with CFE and local water authorities before you sign
PermitsFiled, then you waitFiled and tracked to approval, in parallel with construction
Local authority relationshipsBuilt from scratch, per projectAlready established: we are the liaison
Time to first articleOften 20+ months12 mo avg. to first article
CostBroker fees, consultants, delay costsNo cost to your company
ISL-005Sequence

From first call to first article.

12 mo avg. to first article
  1. Step 1

    Brief & feasibility

    We map your power, labor, and logistics envelope against Reynosa's border-adjacent corridor.

  2. Step 2

    Shortlist & visit

    You walk 3-5 qualified sites with us, benchmarked against your crossing and labor needs.

  3. Step 3

    Land & permit

    Environmental and municipal permits run in parallel with your build-out.

  4. Step 4

    Advisory

    We liaise directly with local and municipal authorities on your behalf, clearing the path before you break ground.

ISL-006Questions

Frequently asked.

Why do electronics and appliance makers cluster in Reynosa?

Decades of maquiladora presence built a qualified labor and supplier base with fast access to US distribution.

How fast can I get a shortlist for Reynosa?

Most clients see a scored shortlist within two to three weeks.

Do you handle permitting too?

Yes, permitting runs in parallel with site selection and construction.

Is Reynosa only good for electronics and appliances?

It's the deepest base, but the same infrastructure serves other precision manufacturers too.

ISL-007References
ISL-008Next action

Tell us what you build. We'll tell you where it lands in Reynosa.

Free. No cost to your company. A softlanding lead replies within one business day.

Free. No cost to your company.

Chat with Us