INDUSTRIAL SOFTLANDING Book a free callFree call
Example plan · illustrative, not a real parkLots scored on power, water, labor, customs · drag to pan
PROPERTY LINE L-16.2 HA L-27.4 HA L-37.0 HA L-45.1 HA L-512.8 HA L-614.6 HA E · E · 115 kV FEED · E · E W · W · POTABLE MAIN · W N 0 to 150 m L-6 · BEST FIT Power 25 MW Water 2,000 m³ Labor deep Customs 140 km 533 m
Nearshoring in Reynosa

Nearshoring in Reynosa

Nearshore into the Rio Grande Valley's manufacturing gateway.

Reynosa pairs a deep electronics and appliance manufacturing base with direct access to the McAllen crossing. Our nearshoring consulting México team gets your relocated line moving product across that border from day one.

18+Plants landed in Reynosa
15 minTo the McAllen crossing
11 moAvg. to first article
7Industrial parks vetted
Get My Free Reynosa Nearshoring Plan

Free. No cost to your company.

18+ plants landed in Reynosa · avg. 11 months to first article

SheetISL-001
ServiceNearshoring
Reply1 business day
Rev2026-07
ISL-002Scope & cost

A fully guided search, on us.

We analyze the market, shortlist the strongest buildings and land for your operation, and arrange your industrial-park inspection tour at no cost to your company.

ItemWhat we doCost to you
Market & site analysisWe benchmark power, water, labor, and logistics against your plant.$0
Vetted, on-the-ground optionsOnly buildings and land our own team has verified make your shortlist.$0
Guided inspection toursWe plan the visit and walk every park with you, in person.$0
ISL-003Site notes

Why manufacturers pick us for nearshoring in Reynosa.

Electronics and appliance base

A mature Tier 1 and Tier 2 supplier network makes Reynosa a strong nearshoring setup México destination for electronics and appliance makers.

Direct border logistics

Minutes from the McAllen crossing, supporting fast, predictable cross-border distribution.

Permitting run in parallel

Environmental and municipal filings proceed alongside construction, not after it.

Full-service landing

Beyond nearshoring setup México, we offer Industrial Softlanding to México and Site Selection to México under one team.

ISL-004Comparison

What changes when you don't do this alone.

ItemGoing it aloneWith Industrial Softlanding
Site power & water dataLandlord estimates, confirmed after you sign (if at all)Confirmed directly with CFE and local water authorities before you sign
PermitsFiled, then you waitFiled and tracked to approval, in parallel with construction
Local authority relationshipsBuilt from scratch, per projectAlready established: we are the liaison
Time to first articleOften 20+ months11 mo avg. to first article
CostBroker fees, consultants, delay costsNo cost to your company
ISL-005Sequence

From first call to first article.

11 mo avg. to first article
  1. Step 1

    Brief & feasibility

    We map your relocation against Reynosa's manufacturing base and border logistics.

  2. Step 2

    Shortlist & visit

    You walk qualified sites across Reynosa's established industrial parks with our team.

  3. Step 3

    Land & permit

    Municipal permits run in parallel with construction.

  4. Step 4

    Advisory

    We liaise directly with local and municipal authorities on your behalf, clearing the path before you break ground.

ISL-006Client note

We needed our relocated electronics line shipping into Texas within the year. Industrial Softlanding made Reynosa work on that timeline.

Client note · name withheld

ISL-007Questions

Frequently asked.

Why is Reynosa strong for nearshoring?

Its deep electronics and appliance manufacturing base and direct McAllen crossing access support fast, reliable cross-border logistics.

What does nearshoring setup México include here?

Site selection, permitting, and local-authority liaison, run as one coordinated program.

Is Reynosa's labor market deep enough for a large relocation?

Yes, decades of electronics and appliance manufacturing have built an experienced, sizeable labor pool.

Can you help with Site Selection only?

Yes, Site Selection to México is available standalone if permitting is already handled.

ISL-008References
ISL-009Next action

Tell us what you build. We'll tell you where it lands in Reynosa.

Free. No cost to your company. A softlanding lead replies within one business day.

Free. No cost to your company.

Chat with Us