Site Selection in Reynosa

Site Selection in Reynosa

Every site in Reynosa, scored against your crossing time.

In Reynosa, real drive time to the McAllen crossing varies more than the map suggests. We benchmark sites against the plant you're actually building.

6Parks vetted in Reynosa
15 minTo the McAllen crossing
6 minTo score your requirements
5-yrIncentive modeling included
Start Your Reynosa Site Selection — Free

Free. No cost to your company.

6 industrial parks vetted · crossing time mapped

SheetISL-001
ServiceSite Selection
Reply1 business day
Rev2026-07
ISL-002Scope & cost

A fully guided search, on us.

We analyze the market, shortlist the strongest buildings and land for your operation, and arrange your industrial-park inspection tour at no cost to your company.

ItemWhat we doCost to you
Market & site analysisWe benchmark power, water, labor, and logistics against your plant.$0
Vetted, on-the-ground optionsOnly buildings and land our own team has verified make your shortlist.$0
Guided inspection toursWe plan the visit and walk every park with you, in person.$0
ISL-003Site notes

Why manufacturers pick us for site selection in Reynosa.

Crossing time scored, not estimated

We measure real drive time and broker congestion at the McAllen crossing, not straight-line distance.

Power scored for electronics tenants

Electronics assembly needs clean, stable power, we check it before you tour.

Labor depth by shift

We model operator availability and competing employers near each site, not a generic city-wide figure.

Incentives modeled over 5 years

State and municipal abatements you actually qualify for, run against your real capex.

ISL-004Comparison

What changes when you don't do this alone.

ItemGoing it aloneWith Industrial Softlanding
Site power & water dataLandlord estimates, confirmed after you sign (if at all)Confirmed directly with CFE and local water authorities before you sign
PermitsFiled, then you waitFiled and tracked to approval, in parallel with construction
Local authority relationshipsBuilt from scratch, per projectAlready established: we are the liaison
CostBroker fees, consultants, delay costsNo cost to your company
ISL-005Sequence

From first call to first article.

  1. Step 1

    Score your requirements

    Six-minute intake on crossing time, power, size, and timeline.

  2. Step 2

    Shortlist in days

    3-5 sites matched to your envelope, with crossing time and labor data attached.

  3. Step 3

    Walk the shortlist

    We walk the sites with you, dock count, power feed, and expansion land included.

  4. Step 4

    Move to permitting

    Once you pick a site, we hand off straight into municipal permitting.

ISL-006Client note

We picked a building based on a map. Industrial Softlanding picked ours based on actual crossing time and power capacity.

Client note · name withheld

ISL-007Questions

Frequently asked.

How is this different from a broker?

Brokers sell inventory. We score it against your crossing time, power, and labor requirements first.

How fast can I get a shortlist for Reynosa?

Most clients get a scored shortlist within two weeks.

Do you score crossing time, not just distance?

Yes, we measure real drive time and congestion at the McAllen crossing.

Can you also handle permitting once I pick a site?

Yes, the handoff into municipal permitting is immediate.

ISL-008References
ISL-009Next action