
Site Selection in Reynosa
Every site in Reynosa, scored against your crossing time.
In Reynosa, real drive time to the McAllen crossing varies more than the map suggests. We benchmark sites against the plant you're actually building.
Free. No cost to your company.
6 industrial parks vetted · crossing time mapped
A fully guided search, on us.
We analyze the market, shortlist the strongest buildings and land for your operation, and arrange your industrial-park inspection tour at no cost to your company.
| Item | What we do | Cost to you |
|---|---|---|
| Market & site analysis | We benchmark power, water, labor, and logistics against your plant. | $0 |
| Vetted, on-the-ground options | Only buildings and land our own team has verified make your shortlist. | $0 |
| Guided inspection tours | We plan the visit and walk every park with you, in person. | $0 |
Why manufacturers pick us for site selection in Reynosa.
Crossing time scored, not estimated
We measure real drive time and broker congestion at the McAllen crossing, not straight-line distance.
Power scored for electronics tenants
Electronics assembly needs clean, stable power, we check it before you tour.
Labor depth by shift
We model operator availability and competing employers near each site, not a generic city-wide figure.
Incentives modeled over 5 years
State and municipal abatements you actually qualify for, run against your real capex.
What changes when you don't do this alone.
| Item | Going it alone | With Industrial Softlanding |
|---|---|---|
| Site power & water data | Landlord estimates, confirmed after you sign (if at all) | Confirmed directly with CFE and local water authorities before you sign |
| Permits | Filed, then you wait | Filed and tracked to approval, in parallel with construction |
| Local authority relationships | Built from scratch, per project | Already established: we are the liaison |
| Cost | Broker fees, consultants, delay costs | No cost to your company |
From first call to first article.
- Step 1
Score your requirements
Six-minute intake on crossing time, power, size, and timeline.
- Step 2
Shortlist in days
3-5 sites matched to your envelope, with crossing time and labor data attached.
- Step 3
Walk the shortlist
We walk the sites with you, dock count, power feed, and expansion land included.
- Step 4
Move to permitting
Once you pick a site, we hand off straight into municipal permitting.
We picked a building based on a map. Industrial Softlanding picked ours based on actual crossing time and power capacity.
Client note · name withheld
Frequently asked.
How is this different from a broker?
Brokers sell inventory. We score it against your crossing time, power, and labor requirements first.
How fast can I get a shortlist for Reynosa?
Most clients get a scored shortlist within two weeks.
Do you score crossing time, not just distance?
Yes, we measure real drive time and congestion at the McAllen crossing.
Can you also handle permitting once I pick a site?
Yes, the handoff into municipal permitting is immediate.