
Site Selection in Monterrey
Every site in Monterrey, scored against your power draw.
Monterrey's industrial parks fill up fast and its grid fills up faster. We benchmark power, water, labor depth, and customs distance against the plant you're actually building.
Free. No cost to your company.
9 industrial parks vetted · 3 substations pre-qualified
A fully guided search, on us.
We analyze the market, shortlist the strongest buildings and land for your operation, and arrange your industrial-park inspection tour at no cost to your company.
| Item | What we do | Cost to you |
|---|---|---|
| Market & site analysis | We benchmark power, water, labor, and logistics against your plant. | $0 |
| Vetted, on-the-ground options | Only buildings and land our own team has verified make your shortlist. | $0 |
| Guided inspection tours | We plan the visit and walk every park with you, in person. | $0 |
Why manufacturers pick us for site selection in Monterrey.
Power scored before you tour
We check substation headroom and feed redundancy before you spend a day walking a building that can't carry your load.
Apodaca, García & Pesquería covered
Direct access to the parks feeding Nuevo León's automotive, appliance, and metal-mechanic suppliers.
Labor depth, not just headcount
We model operator availability and competing employers by shift, not a generic city-wide labor stat.
Incentives modeled over 5 years
State and municipal abatements you actually qualify for, not the headline number in a brochure.
What changes when you don't do this alone.
| Item | Going it alone | With Industrial Softlanding |
|---|---|---|
| Site power & water data | Landlord estimates, confirmed after you sign (if at all) | Confirmed directly with CFE and local water authorities before you sign |
| Permits | Filed, then you wait | Filed and tracked to approval, in parallel with construction |
| Local authority relationships | Built from scratch, per project | Already established: we are the liaison |
| Cost | Broker fees, consultants, delay costs | No cost to your company |
From first call to first article.
- Step 1
Score your requirements
Six-minute intake on power, labor, size, and timeline, scored against Monterrey's actual industrial parks.
- Step 2
Shortlist in days
3-5 sites matched to your envelope, with substation and labor data attached, not just square footage.
- Step 3
Walk the shortlist
We walk the sites with you, power feed, dock count, expansion land, and neighbor mix included.
- Step 4
Move to permitting
Once you pick a site, we hand off straight into municipal permitting, no restart.
Every broker sent us the same five buildings. Industrial Softlanding was the first to tell us which ones actually had the power we needed.
Client note · name withheld
Frequently asked.
How is this different from a broker?
Brokers sell you inventory. We score inventory against your power, labor, and customs requirements before we ever suggest a building.
How fast can I get a shortlist for Monterrey?
Most clients get a scored shortlist within two weeks of the six-minute intake.
Do you check power capacity before I tour?
Always. We pre-qualify substation headroom so you're not touring buildings that can't carry your load.
Can you also handle permitting once I pick a site?
Yes, site selection hands off directly into municipal permitting with the same team.