
Feasibility Studies in Tijuana
Know the numbers in Tijuana before you commit a dollar.
Power, water, labor, and permitting timelines verified on the ground in Otay Mesa and El Florido — not estimated from a spreadsheet in another city.
A fully guided search, on us.
We analyze the market, shortlist the strongest buildings and land for your operation, and arrange your industrial-park inspection tour at no cost to your company.
| Item | What we do | Cost to you |
|---|---|---|
| Market & site analysis | We benchmark power, water, labor, and logistics against your plant. | $0 |
| Vetted, on-the-ground options | Only buildings and land our own team has verified make your shortlist. | $0 |
| Guided inspection tours | We plan the visit and walk every park with you, in person. | $0 |
Why manufacturers pick us for feasibility studies in Tijuana.
Local power and utility audits
We verify substation capacity and water rights on sites in Otay Mesa and El Florido, not just the ones a broker hands us.
electronics, medical device, and aerospace assembly labor modeling
Wage bands and shift availability benchmarked against Tijuana's electronics, medical device, and aerospace assembly workforce, not national averages.
Permitting timeline for Baja California
Every municipal and state approval your operation needs in Tijuana, sequenced against your launch date.
Total landed cost for Tijuana
Rent, utilities, labor, and incentives specific to Otay Mesa rolled into one number for your board.
What makes us the right partner in Tijuana.
We know Tijuana on the ground
Our team has walked sites across Otay Mesa, El Florido, and Pacífico — this is not our first project here.
electronics, medical device, and aerospace assembly expertise
Tijuana runs on electronics, medical device, and aerospace assembly. We benchmark your feasibility study against operators already running here.
No cost to your company
Feasibility studies in Tijuana are part of our no-cost site search service.
What changes when you don't do this alone.
| Item | Going it alone | With Industrial Softlanding |
|---|---|---|
| Site power & water data | Landlord estimates, confirmed after you sign (if at all) | Confirmed directly with CFE and local water authorities before you sign |
| Permits | Filed, then you wait | Filed and tracked to approval, in parallel with construction |
| Local authority relationships | Built from scratch, per project | Already established: we are the liaison |
| Cost | Broker fees, consultants, delay costs | No cost to your company |
From first call to first article.
- Step 1
Define the scope
Tell us your process, footprint, and target launch date.
- Step 2
We verify on the ground
Our team walks the site, confirms utility capacity, and audits the labor pool.
- Step 3
Receive the report
A single document covering power, water, labor, cost, and timeline — board ready.
- Step 4
Decide with confidence
Move to site selection and permitting with numbers instead of guesses.
Their feasibility study caught a substation capacity gap our own engineers missed. That single finding saved us a year.
Client note · name withheld
Frequently asked.
How fast can I get a feasibility study in Tijuana?
Most Tijuana studies are delivered in five to ten business days, covering sites across Otay Mesa and El Florido.
Do you know Tijuana's zones well?
Otay Mesa, El Florido, and Pacífico are all inside our regular coverage area, not a one-off assignment.
What does it cost?
Nothing. Feasibility studies in Tijuana are part of our no-cost site search service for manufacturers evaluating Baja California.