INDUSTRIAL SOFTLANDING Book a free callFree call
Example plan · illustrative, not a real parkLots scored on power, water, labor, customs · drag to pan
PROPERTY LINE L-16.2 HA L-27.4 HA L-37.0 HA L-45.1 HA L-512.8 HA L-614.6 HA E · E · 115 kV FEED · E · E W · W · POTABLE MAIN · W N 0 to 150 m L-6 · BEST FIT Power 25 MW Water 2,000 m³ Labor deep Customs 140 km 533 m
Site Selection in Tijuana

Site Selection in Tijuana

Every site in Tijuana, scored against your crossing time.

In Tijuana, ten minutes of drive time to the border can be the difference between a same-day and a two-day supply chain. We benchmark sites against the plant you're actually building.

8Parks vetted in Tijuana
12 minTo Otay Mesa crossing
6 minTo score your requirements
5-yrIncentive modeling included
Start Your Tijuana Site Selection — Free

Free. No cost to your company.

8 industrial parks vetted · crossing time mapped

SheetISL-001
ServiceSite Selection
Reply1 business day
Rev2026-07
ISL-002Scope & cost

A fully guided search, on us.

We analyze the market, shortlist the strongest buildings and land for your operation, and arrange your industrial-park inspection tour at no cost to your company.

ItemWhat we doCost to you
Market & site analysisWe benchmark power, water, labor, and logistics against your plant.$0
Vetted, on-the-ground optionsOnly buildings and land our own team has verified make your shortlist.$0
Guided inspection toursWe plan the visit and walk every park with you, in person.$0
ISL-003Site notes

Why manufacturers pick us for site selection in Tijuana.

Crossing time scored, not estimated

We measure real drive time and broker congestion to Otay Mesa and Mesa de Otay II, not straight-line distance.

Labor depth by shift, not by city

Tijuana's labor market shifts block by block, we model operator availability and competing employers near each site.

Medical device & electronics fit

We check clean-room readiness and power quality for tenants entering the medical device and electronics cluster.

Incentives modeled over 5 years

State and municipal abatements you actually qualify for, run against your real capex.

ISL-004Comparison

What changes when you don't do this alone.

ItemGoing it aloneWith Industrial Softlanding
Site power & water dataLandlord estimates, confirmed after you sign (if at all)Confirmed directly with CFE and local water authorities before you sign
PermitsFiled, then you waitFiled and tracked to approval, in parallel with construction
Local authority relationshipsBuilt from scratch, per projectAlready established: we are the liaison
CostBroker fees, consultants, delay costsNo cost to your company
ISL-005Sequence

From first call to first article.

  1. Step 1

    Score your requirements

    Six-minute intake on crossing time, labor, size, and timeline, scored against Tijuana's actual industrial parks.

  2. Step 2

    Shortlist in days

    3-5 sites matched to your envelope, with crossing time and labor data attached, not just square footage.

  3. Step 3

    Walk the shortlist

    We walk the sites with you, dock count, clean-room readiness, and expansion land included.

  4. Step 4

    Move to permitting

    Once you pick a site, we hand off straight into municipal permitting, no restart.

ISL-006Client note

We picked a building based on a map. Industrial Softlanding picked ours based on actual crossing time and labor competition on that block.

Client note · name withheld

ISL-007Questions

Frequently asked.

How is this different from a broker?

Brokers sell inventory. We score it against your crossing time, labor, and clean-room requirements first.

How fast can I get a shortlist for Tijuana?

Most clients get a scored shortlist within two weeks.

Do you score crossing time, not just distance?

Yes, we measure real drive time and broker congestion at Otay Mesa and Mesa de Otay II.

Can you also handle permitting once I pick a site?

Yes, the handoff into municipal permitting is immediate.

ISL-008References
ISL-009Next action

Tell us what you build. We'll tell you where it lands in Tijuana.

Free. No cost to your company. A softlanding lead replies within one business day.

Free. No cost to your company.

Chat with Us