Power and water, confirmed before you sign a lease.
Substation capacity, gas pressure, water rights, and grid redundancy — verified on every site we bring you, so your equipment gets what it needs on day one.
A fully guided search — on us.
We analyze the market, shortlist the strongest buildings and land for your operation, and arrange your industrial-park inspection tour — at no cost to your company.
Free market & site analysis
We benchmark power, water, labor, and logistics against your plant, at no charge.
Vetted, on-the-ground options
Only buildings and land our own team has verified make your shortlist.
Guided inspection tours
We plan the visit and walk every park with you, in person — on us.
Why manufacturers pick us for industrial utilities in México.
From first call to first article.
Tell us your load
kW draw, water volume, gas pressure, and any redundancy requirements.
We verify with the utility
Direct confirmation with CFE and local water authorities — not secondhand numbers.
Receive the utility report
A clear breakdown of what is available, what is missing, and what it costs to close the gap.
Move forward with certainty
Use the report in site selection, lease negotiation, or your board presentation.
“We had been quoted eight megawatts available. Their audit found it was actually four and a half. Better to know before we signed.”
Frequently asked.
Do you work directly with CFE?
We coordinate directly with CFE and local utilities to confirm capacity — we do not rely on secondhand numbers.
Can you help increase capacity if a site falls short?
Yes — we can scope substation upgrades or on-site generation and estimate timeline and cost.
How long does a utility verification take?
Typically five to seven business days per site, depending on utility response times.
Is this only for new sites, or existing operations too?
Both — we audit utilities for new site searches and for existing plants planning an expansion.
