
Feasibility Studies in México
Know the numbers before you commit a dollar.
Power capacity, water rights, labor supply, permitting timeline, and total landed cost — a full feasibility study on your shortlisted sites before you sign anything.
A fully guided search, on us.
We analyze the market, shortlist the strongest buildings and land for your operation, and arrange your industrial-park inspection tour at no cost to your company.
| Item | What we do | Cost to you |
|---|---|---|
| Market & site analysis | We benchmark power, water, labor, and logistics against your plant. | $0 |
| Vetted, on-the-ground options | Only buildings and land our own team has verified make your shortlist. | $0 |
| Guided inspection tours | We plan the visit and walk every park with you, in person. | $0 |
Why manufacturers pick us for feasibility studies in México.
Power and utility audits
We verify substation capacity, gas pressure, and water rights on site — not from a brochure.
Labor market modeling
Wage bands, turnover rates, and available headcount pulled from local plant data, not national averages.
Permitting timeline map
Every federal, state, and municipal approval your operation needs, sequenced against your launch date.
Total landed cost model
Rent, utilities, labor, logistics, and incentives rolled into one number for your board.
What changes when you don't do this alone.
| Item | Going it alone | With Industrial Softlanding |
|---|---|---|
| Site power & water data | Landlord estimates, confirmed after you sign (if at all) | Confirmed directly with CFE and local water authorities before you sign |
| Permits | Filed, then you wait | Filed and tracked to approval, in parallel with construction |
| Local authority relationships | Built from scratch, per project | Already established: we are the liaison |
| Cost | Broker fees, consultants, delay costs | No cost to your company |
From first call to first article.
- Step 1
Define the scope
Tell us your process, footprint, and target launch date.
- Step 2
We verify on the ground
Our team walks the site, confirms utility capacity, and audits the labor pool.
- Step 3
Receive the report
A single document covering power, water, labor, cost, and timeline — board ready.
- Step 4
Decide with confidence
Move to site selection and permitting with numbers instead of guesses.
Their feasibility study caught a substation capacity gap our own engineers missed. That single finding saved us a year.
Client note · name withheld
Frequently asked.
How long does a feasibility study take?
Most studies are delivered in five to ten business days, depending on how many sites you want compared.
Do you visit the site in person?
Yes. Every feasibility study includes an on-site verification visit — we do not rely on listing photos or seller claims.
Is this the same as a site selection service?
Feasibility studies feed into site selection. Think of it as the due-diligence layer before you shortlist.
What does it cost?
Nothing. Feasibility studies are part of our no-cost site search service for manufacturers evaluating México.