
Site Selection in León
Every site in León, scored against your production envelope.
León's industrial parks range from converted leather workshops to new-build Class A space. We benchmark sites against the plant you're actually building, not the building's history.
Free. No cost to your company.
6 industrial parks vetted · Bajío corridor access mapped
A fully guided search, on us.
We analyze the market, shortlist the strongest buildings and land for your operation, and arrange your industrial-park inspection tour at no cost to your company.
| Item | What we do | Cost to you |
|---|---|---|
| Market & site analysis | We benchmark power, water, labor, and logistics against your plant. | $0 |
| Vetted, on-the-ground options | Only buildings and land our own team has verified make your shortlist. | $0 |
| Guided inspection tours | We plan the visit and walk every park with you, in person. | $0 |
Why manufacturers pick us for site selection in León.
Building fit verified, not assumed
We confirm clear height, floor load, and utility capacity match your equipment, not just your square footage need.
Bajío logistics scored
Real transit time to Silao, Celaya, and Irapuato's supplier networks.
Labor depth for precision roles
We model quality, tooling, and assembly technician availability, not generic headcount.
Incentives modeled over 5 years
State and municipal abatements you actually qualify for, run against your real capex.
What changes when you don't do this alone.
| Item | Going it alone | With Industrial Softlanding |
|---|---|---|
| Site power & water data | Landlord estimates, confirmed after you sign (if at all) | Confirmed directly with CFE and local water authorities before you sign |
| Permits | Filed, then you wait | Filed and tracked to approval, in parallel with construction |
| Local authority relationships | Built from scratch, per project | Already established: we are the liaison |
| Cost | Broker fees, consultants, delay costs | No cost to your company |
From first call to first article.
- Step 1
Score your requirements
Six-minute intake on production needs, power, size, and timeline.
- Step 2
Shortlist in days
3-5 sites matched to your envelope, with utility and labor data attached.
- Step 3
Walk the shortlist
We walk the sites with you, clear height, floor load, and expansion land included.
- Step 4
Move to permitting
Once you pick a site, we hand off straight into municipal permitting.
The first building we toured still had leather-tanning drains in the floor. Industrial Softlanding found us one built for what we actually make.
Client note · name withheld
Frequently asked.
How is this different from a broker?
Brokers sell inventory. We score it against your production needs, power, and labor requirements first.
How fast can I get a shortlist for León?
Most clients get a scored shortlist within two weeks.
Do you check building fit before I tour?
Always, we confirm clear height, floor load, and utilities match your equipment first.
Can you also handle permitting once I pick a site?
Yes, the handoff into municipal permitting is immediate.